Boiler Gorenie Instruktsiia -
The unit must be mounted vertically on a wall using appropriate screws with a minimum diameter of 8 mm . If the wall is weak, it must be reinforced.
The heater must be filled with water before it is connected to power. Installation should be performed by a qualified expert in accordance with local electrical standards. 2. Operation and Temperature Control boiler gorenie instruktsiia
If your local water pressure exceeds , a reduction valve is required. The unit must be mounted vertically on a