everything else (align all non-constraints to the bottleneck).
Increase throughput (the rate at which a system generates money or value). The Five Steps: Identify the bottleneck (the weakest link). Exploit it (ensure the bottleneck is never idle). constraint
In Project Management , this refers to the balance between Time , Cost , and Scope . 💻 Tech: Layouts & Programming constraint